Treatment capacity of wastewater plants - urban wastewater treatment plants - tertiary treatment - design capacity bod5 reached 15.1 tonnes of O2/day in 2013 in Serbia, according to Eurostat. This is 64.1% more than in the previous year.
Historically, Treatment Capacity of Wastewater Plants - Urban wastewater treatment plants - tertiary treatment - Design capacity BOD5 in Serbia reached an all time high of 15.1 tonnes of O2/day in 2013 and an all time low of 9.20 tonnes of O2/day in 2012.
Buy Treatment Capacity of Wastewater Plants - Urban wastewater treatment plants - tertiary treatment - Design capacity BOD5 data for Serbia.
Buy annual subscriptions for all our products.