Treatment capacity of wastewater plants - urban wastewater treatment plants - secondary treatment - design capacity bod5 reached 58.3 tonnes of O2/day in 2013 in Serbia, according to Eurostat. This is 5.23% more than in the previous year.
Historically, Treatment Capacity of Wastewater Plants - Urban wastewater treatment plants - secondary treatment - Design capacity BOD5 in Serbia reached an all time high of 58.3 tonnes of O2/day in 2013 and an all time low of 55.4 tonnes of O2/day in 2012.
Buy Treatment Capacity of Wastewater Plants - Urban wastewater treatment plants - secondary treatment - Design capacity BOD5 data for Serbia.
Buy annual subscriptions for all our products.