Time required to build a warehouse (days) reached 93.0 days in 2014 in Tunisia, according to . This is 0% more than in the previous year.
Historically, Time Required To Build A Warehouse (days) in Tunisia reached an all time high of 93.0 days in 2014 and an all time low of 86.0 days in 2005.
Tunisia has been ranked 138th within the group of 167 countries we follow in terms of Time Required To Build A Warehouse (days).
Buy annual subscriptions for all our products.