Time required to build a warehouse (days) reached 154 days in 2014 in Switzerland, according to . This is 0% more than in the previous year.
Historically, Time Required To Build A Warehouse (days) in Switzerland reached an all time high of 154 days in 2014 and an all time low of 154 days in 2005.
Switzerland has been ranked 75th within the group of 167 countries we follow in terms of Time Required To Build A Warehouse (days).
Buy annual subscriptions for all our products.