Institutional Sign In

Go

Metallurgical Coal Production (TJ) in New Zealand

Source: EIA
Last Updated: June 11, 2021

Metallurgical coal production (tj) reached 38,280 TJ in 2019 in New Zealand, according to . This is 1.02% less than in the previous year.

Historically, Metallurgical Coal Production (TJ) in New Zealand reached an all time high of 80,292 TJ in 2006 and an all time low of 12,324 TJ in 1982.

$1.99

Buy Metallurgical Coal Production (TJ) data for New Zealand.

from $199/month

Buy annual subscriptions for all our products.