A PHP Error was encountered

Severity: Warning

Message: Invalid argument supplied for foreach()

Filename: controllers/Indicators.php

Line Number: 406

Labour Cost Index (Total labour cost, yoy) in Croatia | Helgi Library

Labour Cost Index (Total labour cost, yoy) in Croatia

Source: Eurostat
Last Updated:

Labour cost index (total labour cost, yoy) reached in 0 in Croatia, according to . This is 0% more than in the previous year.

Historically, Labour Cost Index (Total labour cost, yoy) in Croatia reached an all time high of ERROR: explode() expects parameter 2 to be string, array givenERROR: Trying to access array offset on value of type nullERROR: Array to string conversion Array in ERROR: A non-numeric value encountered and an all time low of ERROR: A non-numeric value encounteredERROR: explode() expects parameter 2 to be string, array givenERROR: Trying to access array offset on value of type nullERROR: Array to string conversion Array in ERROR: A non-numeric value encountered.

$1.99

Buy Labour Cost Index (Total labour cost, yoy) data for Croatia.

from $199/month

Buy annual subscriptions for all our products.