A PHP Error was encountered

Severity: Warning

Message: Invalid argument supplied for foreach()

Filename: controllers/Indicators.php

Line Number: 406

Electricity Production from Wind Power in Kosovo | Helgi Library

Electricity Production from Wind Power in Kosovo

Source: EIA, BP Statistical Review of World Energy (June 2018)
Last Updated: June 12, 2021

Electricity production from wind power reached in 0 in Kosovo, according to World Bank / EIA. This is ERROR: Undefined index: XK0% more than in the previous year.

Historically, electricity production from wind power in Kosovo reached an all time high of ERROR: Undefined index: XKERROR: asort() expects parameter 1 to be array, null givenERROR: end() expects parameter 1 to be array, null given in ERROR: Undefined index: XKERROR: asort() expects parameter 1 to be array, null givenERROR: array_keys() expects parameter 1 to be array, null givenERROR: end() expects parameter 1 to be array, null given and an all time low of ERROR: Undefined index: XKERROR: asort() expects parameter 1 to be array, null givenERROR: reset() expects parameter 1 to be array, null given in ERROR: Undefined index: XKERROR: asort() expects parameter 1 to be array, null givenERROR: array_keys() expects parameter 1 to be array, null givenERROR: reset() expects parameter 1 to be array, null given.

$2.99

Buy Electricity Production from Wind Power data for Kosovo.

from $199/month

Buy annual subscriptions for all our products.